Read it if the work you have already sold comes out of the door slower than you want. That is the problem the book is built for, and two evenings is a fair price. If the problem is that not enough work comes in at all, put it aside for now: Goldratt's factory has more orders than it can fill, and nearly every lesson quietly assumes that. It is a novel from 1984 about a plant making machine parts, and a good third of it does not survive the trip to a firm of five people. The part that does is still the clearest account we know of why a business can be busy everywhere and slow anyway.

We started the reviews here because our own work starts where the book starts, at the constraint, which also means we read it with a grudge. The translation from a factory floor to a service business is nothing like as clean as people repeating the summary admit, and where it breaks is the interesting part.

What the book actually is

Eliyahu M. Goldratt was an Israeli physicist. He wrote The Goal in 1984 with Jeff Cox, and wrote it as a novel, a strange decision for a man whose day job was selling production scheduling software. Alex Rogo has three months to turn a failing plant around before head office shuts it. A former physics teacher called Jonah keeps turning up and answering his questions with harder questions. By the last chapter the plant is profitable and the reader has absorbed the Theory of Constraints without once being handed a definition of it.

The novel is the reason anyone still reads it. Nobody remembers a bullet list about capacity. A surprising number of people remember Herbie.

Herbie, and why that scene does the work

Herbie is a boy on a hike. Alex takes his son's scout troop out for the day and the column keeps stretching apart, so the boys at the front stop and wait. The troop moves at the pace of its slowest walker, a heavy, cheerful boy named Herbie. Alex spreads the contents of Herbie's pack among the other boys, puts him at the front, and the whole troop speeds up.

What the scene demonstrates is sharper than find your slow point. Two things happen at once: the steps depend on each other, and each step varies. A fast walker cannot bank the ground he gains, because he still ends up behind the boy in front. The slow walker's bad stretches pass straight down the line. Gains do not accumulate. Losses do. That asymmetry is the entire book, and it holds in a firm of five where the designer waits on the copy and the invoice waits on the designer. It is why we open an engagement by tracing one job end to end and looking for the longest wait.

The five focusing steps

Strip the plot out and the framework is five steps, stated plainly enough that they fit on an index card.

Exhibit 1

The five steps in order, and the third is where small firms quietly give up.

The five focusing steps, read for a firm of five people 1 Identify the constraint The one place the work waits. In a small firm, a person. 2 Exploit the constraint Get everything out of it before you spend a dollar. 3 Subordinate everything else to it Every other step runs at the constraint's pace. 4 Elevate the constraint Now spend: hire, buy, train, or send the work outside. 5 Go back to step one It moves. Yesterday's fix becomes today's constraint.
Note: the five steps are Goldratt's, restated in plain language. The short line under each one is our reading of what that step means in a service business, not his wording.

Step two is better than its name. Exploit means get everything out of the constraint you already own before spending a cent on it. Stop letting it do work a junior could do. Do not feed it jobs that come back for rework. Never let it idle at nine in the morning because nobody prepared the next thing. Most of the gain in the novel comes out of step two, and step two is free.

Step three is where a small firm gives up, and it is the one we would underline twice. Subordinate means the rest of the business deliberately runs slower than it could. That is hard to follow when the person running slower sits ten feet away and looks unoccupied. In an office of five it is a social problem first.

What travels from the plant to a service firm

The core claim arrives intact: the output of the business equals the output of the constraint, so an improvement made anywhere else is not an improvement, whatever it did to that team's numbers. Then the difference between busy and productive. A plant that keeps every machine running makes piles of parts nobody ordered. A firm that keeps everybody billable produces eleven half-finished jobs and no invoices.

Goldratt's inventory measure travels too, once you work out where your inventory lives. In a plant it is steel in the aisle, impossible to walk past. In a service firm it is the proposal half-written in somebody's drafts, the job waiting on a client answer, the report that is nearly done. Money already spent and not yet paid for, none of it visible, which is why it accumulates.

Drum, buffer and rope is the scheduling idea the plant ends up running on, and the one piece of factory machinery we would carry across whole. The constraint is the drum and sets the beat. The buffer is prepared work kept in front of it so it never idles. The rope ties the front of the process back to the drum, so new work is released only at the rate the drum can absorb. In a small firm the rope is the hard part, because it is your sales pipeline and nobody enjoys telling a client to wait three weeks.

Exhibit 2

Drum, buffer and rope, rewritten for a firm where the constraint is a person.

Pace the whole firm to the drum the rope Work you take on Sales, promises, the job somebody said yes to. Buffer A small queue of prepared work, so the drum never idles. Drum The constraint. It sets the pace for the whole firm. Everything downstream Runs no faster than the drum, however hard you push it.
Note: drum, buffer and rope is Goldratt's scheduling idea from the plant. The labels here are our translation of it for a service business, where the rope is the sales pipeline rather than the release of raw material.

What does not travel

Goldratt's constraint is a machine, and this is where we part company with the way The Goal usually gets recommended. A heat treat oven does not resent being scheduled through lunch. When the constraint is a person, and in a firm of five it almost always is, exploit the constraint quietly becomes work that person harder. It buys one good quarter and then a resignation. The step has to be rewritten around a human being: defend the calendar, take the admin away, stop routing every question through them, and accept a ceiling a machine does not have.

Next comes stability. Alex's plant runs the same parts week after week, so once the constraint is found it stays found. Client work is not like that. On one website build the constraint is the copy, on the next the client's legal review, on the third it is you. The fifth step does say go back and look again, but Goldratt means after a constraint has been broken, not because next month's jobs are shaped differently. A small firm runs step one far more often than the book implies.

Then demand. The plant is capacity-limited from page one, and market demand only becomes the binding limit near the end, in a thin section. A firm of three to ten people is often demand-limited from the start. The five steps still apply, but exploiting a market constraint is sales work, and The Goal is not a sales book. It hands you a beautifully sharp tool for a problem you do not have.

A stretch of the novel is not addressed to you at all. The head office politics and the long fight about cost accounting come out of a corporate reporting system a five-person firm neither owns nor gets distorted by. Skim it without guilt.

Exhibit 3

Four differences between Goldratt's plant and a five-person service firm.

Goldratt's plant A five-person service firm The constraint is a machine that never gets tired. The constraint is a person, usually the owner. The same parts run week after week. Every job is shaped a little differently. Half-done work sits in piles you trip over. Half-done work hides in a drafts folder. Orders arrive faster than the plant can fill them. Often there are not enough orders at all.
Note: the left column describes the plant in the novel. The right column is our own view of the small service firms this site is written for, not a survey.

How to read it

Two evenings, or one long flight. Do not take notes on the plot. Keep one unfinished sentence beside you and complete it honestly as you read: our Herbie is. Most owners cannot fill that in at the first attempt, which is useful by itself.

Then run the five steps once on paper against the real business, before hiring anyone or buying anything. If that produces a genuine argument about which of two things is the constraint, you have the value out of the book already. That first pass is roughly where our management consulting work begins.

The verdict

Yes for the owner who is busy and behind. No, or not yet, for the owner with gaps in the calendar and a quiet inbox, because the book will send you tuning a delivery process that was never what held you back. Read it as a way of seeing rather than a manual, and expect to do the translation yourself. Goldratt does not do it for you.

One honest exception. If somebody has already told you the Herbie story, you can name your constraint out loud, and the team really is subordinating to it, the novel will give you a pleasant evening and not much method. Most owners are nowhere near that. They can name the loudest problem in the business immediately and the slowest one not at all, and more than forty years on that is still what the book is for.

Start a conversation

All notes Start a conversation